Preparing the STIGA Head Office for the future!

Posted By: Stiga Admin In: Root

The demand for STIGA products around the world grows stronger. To keep up with the growing demand, we are expanding our Head Office in Eskilstuna, Sweden with a new 2 800 m2 building. The Head Office reconstruction will be ready in the end of this summer, resulting in a Head Office space measuring a total of 11 000 m2!

We are ready for the future!

Comments

Leave your comment